Don't Forget the Parts That Make the Lights Work

Choose one small project first. Use this checklist before checkout; not every project needs every item.

Your Display

  • Pixels with the correct voltage, node count and spacing
  • A coro prop, roofline mount or MegaTree structure
  • Extra nodes or repair parts if desired

Control and Power

  • Controller compatible with the pixel protocol and output wiring
  • Correctly rated power supply, enclosure and fused distribution
  • Appropriately rated power/data extensions and any required injection components
  • Matching xConnect or Mconnect ends and compatible adapters, if required

Mount and Protect

  • Strips, clips or prop mounting hardware
  • Weather-appropriate mounting and strain relief
  • Weather-resistant housing for components that need it

Before Checkout

  1. Count every pixel and controller port.
  2. Confirm voltage and protocol for each product.
  3. Check connector family and pinout; never assume.
  4. Measure cable runs and plan power injection where necessary.
  5. Plan a basic bench test before mounting.

Need a compatibility check? Send your planned products, number of pixels and display dimensions to Support@MattosDesigns.com.

First Show Guide · Education Hub

Use a worked project and a saveable plan

Start with the matched project lists to review exact variants, quantities and current availability. Get the editable planner and printable bench sheets to record equipment you own, cables, outputs and test results.